Intranet

Road Concessions

Green Corridor

Green CorridorGreen Corridor
Green CorridorGreen Corridor
Green CorridorGreen Corridor

Acknowledgments /Milestones

  • Performance of the works on the left turn of Yara, with an approximate investment of USD 187,000, and installation of concrete blocks on the border between PosChiquito and the Española Lake Bridge.
  • It contributes to social well-being and environmental care, with participation in initiatives such as: Back to School, Druif Beach Clean-up and the Cycling Race May.

Construction of a second lane between the Queen Beatrix Airport and PosChiquito, including three round-about intersections, building of a bridge over Caño Mahuma and construction of an upper arch bridge over Española Lake. In the PosChiquito area, a ramp will be built and secondary roads will be rehabilitated in the areas of San Nicolas, Savaneta, PosGrande and PosChiquito.

LOCATION

Aruba

The Project

Aruba

$ 0 B
Investment
0 km
of two-lane highway
0 km
long
0
direct employees
0
indirect employees